33/11 kV Substation & Overall Electrical System of Ceramics Factory.
Position: Electrical Design Engineer
Timeline: January 2017 to April 2017
Location: Bahubol, Sylhet, Bangladesh
Company: Kanika Commercial Ltd. - https://rico-ceramics.com/

Main Project Features

➤ Electrical Design, Planning & Drawing of 33/11 kV Substation & Electrical system for production floor-1.

Activities Performed

Responsible for design and drawing of 33/11 kV substation earthing system, Switchyard layout, Electrical SLD for MV & LV system, Switchgear & control room design. Sizing Calculation & Preparation of technical data sheet for LA, PT, CT, DS, CB, TX, Main bus (ACSR Conductor) and DC Systems. Preparation of BOQ for Cables, Substation equipment’s, Gantry Structures, Clamp & Connectors. Design & preparation of BOQ for Busbar Trunking (BBT) System (for production floor-1), indoor & outdoor lighting system.