➤ 40/50 MVA Transformer Erection, Installation, Oil Filtration, Cabling and Testing & Commissioning of Substation equipment’s of Bay-2.
Responsible for the dismantling of burned substation equipment, including 30/35 MVA Power Transformer & connecting cables of Bay-2. After that, 40/50 MVA Power Transformer erection, installation, oil filtration, cable connection, and testing & commissioning of substation equipment are of Bay-2.